HP0-390
Planning & Deployment of HP BladeSystem Solutions
Certification III HP Certification III HP0-390考試題庫由KillTest認證題庫網資深IT認證講師和Certification III HP Certification III產品專家結合PROMETRIC或VUE的真實HP0-390考試環境最新原題傾心打造。
題庫覆蓋了當前最新的真實考題,並且全部附有正確答案,我們承諾題庫對Certification III HP Certification III HP0-390(Planning & Deployment of HP BladeSystem Solutions)考試原題完整覆蓋。HP0-390題庫助您輕鬆通過認證考試,一次不過全額退款。
Planning & Deployment of HP BladeSystem Solutions |
![]() |
|||
| 認證編號 | Q&A | 更新 | 價格(美元) | |
HP0-390 |
120 Q&A | 2008-12-01 | $ 89 | |
Certification III HP Certification III HP0-390(Planning & Deployment of HP BladeSystem Solutions)考題由我們的資深IT認證講師和Certification III HP Certification III產品專家精心打造,包括了當前最新的真實HP0-390考題,全部附有正確答案。
所有購買KillTest HP0-390 題庫的客戶都將得到60天的免費升級服務,保證了客戶的一次通過率。KillTest IT認證題庫網助您一次通過Certification III HP Certification III HP0-390考試。
1、本題庫源自合作考試中心的真實考試原題,截屏后由我們的專業團隊匯總整理,再經過合作培訓中心資深IT認證講師對考題校對,保證了認證考試題庫的專業品質,題庫試題正確率100%,對HP0-390認證考試考題覆蓋率96%以上。您只需在參加Certification III HP Certification III HP0-390認證前整體學習下本題庫,必定可以輕鬆完成考試,一次通過認證。
2、KillTest 實行“一次不過全額退款”承諾。如果您購買了我們的《HP0-390 Exam》考題,只要不是首次通過,憑蓋有PROMETRIC或VUE考試中心鋼印的考試成績單,我們將退還您購買HP0-390題庫的全部費用,絕對保證您的利益不受到任何的損失。(全額退款詳情)
3、作為亞太地區最專業的IT認證試題題庫供應商,我們提供完善的售後服務,我們對所有購買題庫的客戶提供跟蹤服務,在您購買考題后的60天內,享受免費升級考題服務,如果在這期間,認證考試中心對HP0-390考題做出修改或變題,我們會在第一時間更新相關題庫,并免費提供給您更新下載。
Planning & Deployment of HP BladeSystem Solutions(HP0-390 Exam)屬於Certification III HP Certification III認證考試中的一門,如果需要取得Certification III HP Certification III證書,您可能還需要參加其他相關考試,詳情可訪問Certification III HP Certification III認證專題,在那裡,你將看到所有Certification III HP Certification III認證相關考試科目。
HP0-390:下载HP0-390考试题库演示部分(PDF格式)
HP0-390题库部分演示(DEMO)
1.You install and configure the Altiris Deployment Solution from the HP RDP 1.60 CD on a supported ProLiant server running Microsoft Windows Server 2003. Then you install the ProLiant Integration Module. When you open the Deployment Server Console, you find the SmartStart Toolkit and OS Imaging Events and the SmartStart Toolkit Hardware Configuration Events folders, but no scripted install jobs for any of the ProLiant BL server blades. Why?
A.no RDP licenses were available, and only the free portion of the ProLiant Integration Module installed
B.the Deployment Server Agent was not installed and configured
C.the RDP pre-deployment environment was not configured correctly
D.the Windows and Linux scripted install jobs were not selected by default when installing the ProLiant Integration Module
Correct:D
2.Where do the operating system distribution files reside during a Red Hat Enterprise Linux AS 3 deployment using RDP 1.60?
A.on a Linux Network File System (NFS) server
B.on the deployment server in the CD-ROM drive
C.on the deployment server in the Client Access Point share
D.on the deployment server in the RDP eXpress database
Correct:A
3.Which software packages make up the HP ProLiant Essentials Rapid Deployment Pack? Select THREE.
A.Altiris Deployment Server
B.Automation Manager
C.HP BladeSystem Integrated Management
D.Integrated Lights-Out Advanced
E.ProLiant Integration Module
F.SmartStart Scripting Toolkit
Correct:A E F
4.You configured RDP with the Rip-and-Replace functionality and chose to re-deploy the computer automatically when a new server blade was detected in the appropriate server bay. The failed server blade was configured to boot from internal drives, but was also connected to an MSA1000 that is shared among several server blades within the same server blade enclosure. After RDP replays the appropriate jobs on the new server blade, you can no longer access the MSA1000. Why?
A.The dual-path software was not reconfigured with the new server blade serial number.
B.The MSA1000 access license was not migrated from the failed server blade to the new server blade.
C.The new server blade host bus adapters (HBAs) were not enabled in the QLogic Fast!UTIL utility.
D.The Selective Storage Presentation (SSP) was not reconfigured for the new server blade HBA world wide IDs.
Correct:D
5.What is the maximum HP BladeSystem configuration using a 42U rack and redundant power?
A.two power enclosures, six server blade enclosures
B.four power enclosures, four server blade enclosures
C.four power enclosures, five server blade enclosures
D.six power enclosures, six server blade enclosures
Correct:C
6.When is it required to use a load-balancing signal cable?
A.When using facility DC power.
B.When using three-phase A/C power.
C.When two power enclosures are connected to a scalable bus bar.
D.When two power enclosures are connected to server blade enclosures using power bus boxes.
Correct:C
7.Which utility enables you to approximate the power and heat load per rack, and calculate the full environmental impact of racks with varying configurations and loads?
A.Enterprise Configurator
B.ProLiant BL p-Class Power Calculator
C.Rack and Power Calculator
D.Site Installation Preparation Utility
Correct:D
8.You need to enable maximum trunk bandwidth between both GbE2 interconnect switches and an external production network infrastructure. How many RJ-45 network cables are necessary for an enhanced server blade enclosure that is fully populated with ProLiant BL30p server blades?
A.6
B.8
C.12
D.18
Correct:C
9.Which HP server blade supports two non-hot-pluggable 2.5-inch ATA drives?
A.ProLiant BL20p G2
B.ProLiant BL20p G3
C.ProLiant BL30p
D.ProLiant BL40p
Correct:C
10.Which hardware information file must you use in the RDP 1.60 deployment job to have ProLiant BL20p G2/G3 server blades boot Red Hat Enterprise Linux AS 3 from SAN?
A.bl20p-a.ini
B.bl20p-h.ini
C.linux-h.ini
D.pl-bfs.ini
Correct:D
11.Which file customizes the scripted Microsoft Windows 2003 installation using RDP 1.60?
A.wnet.txt
B.w2k3.txt
C.unattend.txt
D.win2003.txt
Correct:A
12.You are deploying Red Hat Enterprise Linux AS 3 to ProLiant BL30p server blades using RDP 1.60 WE. These server blades are connected to the MSA1000 storage solution from which they must boot the operating system. You located and modified the bl30p.ks.cfg kickstart file. During the Linux deployment, the Linux installer reports that it cannot read the contents of the kickstart file. Why?
A.RDP 1.60 WE does not support deploying Red Hat Enterprise Linux AS 3 to ProLiant BL30p server blades
B.you did not enable Linux support in the Selective Storage Presentation (SSP) of the MSA1000
C.you used a Windows-based editor such as Notepad which inserted unsupported CR+LF in the kickstart file
D.you did not modify the RDP job for the appropriate NFS server
Correct:C
13.Which components must be installed in the HP BladeSystem to enable SAN connectivity for the ProLiant BL20 and BL30 series server blades? Select THREE.
A.pass-through mezzanine board for the interconnect switch
B.GbE2 Interconnect Switches
C.SAN-enabled server blade enclosure management module
D.mezzanine or balcony server blade host bus adapters
E.eight-port interconnect module for the interconnect switch
F.server blade enclosure with enhanced backplanes
Correct:A D E
14.Which hardware components are required to provide redundant SAN connectivity for an enhanced server blade enclosure fully populated with ProLiant BL20p G3 server blades? Select FOUR.
A.two GbE2 Interconnect Switches
B.one Fibre Channel mezzanine host bus adapter for each server blade
C.two Fibre Channel mezzanine host bus adapters for each server blade
D.one Fibre Channel balcony host bus adapter for each server blade
E.two Fibre Channel balcony host bus adapters for each server blade
F.two Octal FC interconnect modules
G.two Fibre Channel Retimer mezzanine cards
H.two 64-bit PCI-X expansion slot host bus adapters for each server blade
Correct:A B F G
15.How many hot-pluggable power supplies does the three-phase 3U power enclosure support?
A.4
B.6
C.8
D.10
Correct:B
16.What is the primary difference between the original ProLiant BL p-Class server blade enclosure and the enhanced ProLiant BL p-Class server blade enclosure?
A.The enhanced server blade enclosure includes two additional bays for redundant network interconnects.
B.The enhanced server blade enclosure aggregates server blade iLOs into a single port on the side B network interconnect.
C.The enhanced server blade enclosure no longer requires use of the server blade sleeve for the ProLiant BL30p server blades.
D.The enhanced server blade enclosure has a split power backplane and requires two power enclosures for power redundancy.
Correct:D
17.Which ProLiant BL server blade requires a balcony card for SAN connectivity?
A.ProLiant BL20p G2
B.ProLiant BL20p G3
C.ProLiant BL30p
D.ProLiant BL40p
Correct:C
18.What was the primary reason for the introduction of the enhanced ProLiant BL p-Class server blade enclosure?
A.increased network connectivity requirements of the ProLiant BL30p server blades
B.increased cooling requirements of the ProLiant BL30p server blades
C.increased power requirements of the ProLiant BL30p server blades
D.increased SAN connectivity requirements of the ProLiant BL30p server blades
Correct:C
19.Which power distribution option requires the dual power input kit for power redundancy?
A.mini bus bar
B.power bus box
C.scalable bus bar
D.facility DC power
Correct:A
20.You have an enhanced server blade enclosure connected to a single power enclosure. Only side A of the server blade enclosure is connected to the power enclosure. Which server blade enclosure bays receive DC power?
A.bays 1 through 5
B.bays 2 through 9
C.bays 1 through 10
D.bays 1 through 5 and bay 10
E.bays 6 through 10 and bay 1
Correct:D
21.What are the total number of bays in the ProLiant BL p-Class server blade enclosure?
A.8
B.10
C.12
D.16
Correct:B
22.What is the maximum number of power enclosures that can be connected to a scalable bus bar?
A.1
B.2
C.3
D.4
Correct:B
23.You have an enhanced server blade enclosure fully populated with server blades. You need to provide power redundancy to those blades. What is the correct configuration?
A.one fully populated power enclosure; server blade enclosure side A connected to power enclosure side A
B.one fully populated power enclosure; server blade enclosure side A connected to power enclosure side A; server blade enclosure side B connected to the power enclosure side B
C.two fully populated power enclosures; server blade enclosure side A connected to side A of power enclosure 1; server blade enclosure side B connected to side B of power enclosure 2
D.two fully populated power enclosures; server blade enclosure side A connected to side A of both power enclosures; server blade enclosure side B connected to side B of both power enclosures
Correct:D
24.You have an original server blade enclosure fully populated with server blades. You need to provide power redundancy to those blades. What is the correct configuration?
A.one fully populated power enclosure; server blade enclosure side A connected to power enclosure side A
B.two fully populated power enclosures; server blade enclosure side A connected to side A of both power enclosures
C.one fully populated power enclosure; server blade enclosure side A connected to power enclosure side A; server blade enclosure side B connected to the power enclosure side B
D.two fully populated power enclosures; server blade enclosure side A connected to side A of power enclosure 1; server blade enclosure side B connected to side B of power enclosure 2
Correct:C
25.What is the primary difference between the ProLiant BL20p G3 and the ProLiant BL20p G2?
A.The ProLiant BL20p G3 has three NICs, two SAN ports, and iLO.
B.The ProLiant BL20p G3 supports up to four processors.
C.The ProLiant BL20p G3 has four NICs, two SAN ports, and iLO.
D.The ProLiant BL20p G3 requires a server blade sleeve.
Correct:C
26.What is the maximum number of power enclosures that can be connected to a mini bus bar?
A.1
B.2
C.3
D.4
Correct:A
27.You are diagnosing a problem with an HP BladeSystem infrastructure. The installed server blades do not power on and the power supply AC power LEDs and fault LEDs are both off. You have ensured that the power enclosure is properly cabled and connected to 240VAC outlets. What is the cause of this problem?
A.The power bus bar circuit breakers are in the off position.
B.The power enclosure circuit breakers are in the off position.
C.The power zones are incorrectly set.
D.The sides A and B of the power enclosure do not have an equal number of power supplies.
Correct:B
28.You connect a ProLiant BL40p server blade to the Diagnostic Station. When you attempt to power on the server blade, it does not turn on. Why?
A.ProLiant BL40p server blades are not supported with the Diagnostic Station
B.two Diagnostic Stations are required to power the ProLiant BL40p server blades
C.you connected the Diagnostic Station to a single-phase AC power instead of the required three-phase power
D.you used a single power supply in the Diagnostic Station instead of two
Correct:D
29.Which HP server blade carries a three-year warranty on the server hardware, but only a one-year warranty on its disk drives?
A.ProLiant BL20p G2
B.ProLiant BL20p G3
C.ProLiant BL30p
D.ProLiant BL40p
Correct:C
30.What is the function of the ProLiant BL p-Class Diagnostic Station?
A.scans all major hardware components of a ProLiant BL p-Class server blade for failures
B.powers on and enables communication with a single ProLiant BL p-Class server blade or an interconnect switch outside the rack environment
C.diagnoses communication problems between the ProLiant BL p-Class server blades, the supported interconnect switches, the server blade enclosure, and the power enclosure
D.tests and diagnoses the functionality of either a ProLiant BL p-Class server blade or an interconnect switch
Correct:B
KillTest IT認證題庫網專業提供Certification III HP Certification III HP0-390最新題庫下載,完全覆蓋HP0-390考試原題。HP0-390:Certification III HP Certification III HP0-390 Questions and Answers,Planning & Deployment of HP BladeSystem Solutions
![]() |
||
![]() |
||
![]() |